Prepare a clearer PCB Assembly or EMS & Box Build inquiry.
File checklists and guidance for preparing a quotation request.
Use Resources to organize the RFQ file package and project requirements before emailing Venture Electronics.

RFQ checklist
Send the latest files and project requirements that affect pricing, material responsibility, testing, packaging and delivery.
| File / information | Why it helps |
|---|---|
| Gerber / ODB++ | Board fabrication and assembly review |
| BOM | Component sourcing and risk review |
| CPL / XY file | SMT placement preparation |
| Assembly drawing | Polarity, connector, and mechanical notes |
| Quantity | Material planning and quotation scope |
| Testing requirement | Fixture, firmware, and acceptance planning |
| Packaging / delivery | Labels, ESD, destination, and document needs |
| NDA / large file note | Safe transfer path before sharing sensitive files |
Project requirements to include
- Quantity and target schedule
- PCB fabrication requirements when applicable
- Consigned, kitted, partial-turnkey, full-turnkey or mixed supply model
- Test plan, firmware, fixture, golden sample or acceptance criteria
- Programming, coating, marking, label, packaging or delivery requirements
- NDA or file-transfer requirements
Additional EMS & Box Build information
- System BOM
- Enclosure and mechanical drawings
- Cable or harness drawings
- Assembly instructions
- System-level test procedure
- Packaging and accessories list
RFQ FAQ
What RFQ inputs should I prepare before emailing Venture Electronics?
Gerber or ODB++, BOM, CPL, assembly drawing, quantity, testing requirements, and delivery expectations are the main RFQ inputs.
Can I start an RFQ without a complete test plan?
Yes, but we may ask for fixture, firmware, acceptance criteria, or test procedure details before confirming testing scope.
Can Venture Electronics review BOM alternatives?
Alternatives can be discussed when sourcing or lifecycle risk appears, but customer approval is required before substitution.
How should I send large or sensitive project files?
Start by email and confirm the preferred transfer method before sending large, sensitive or NDA-protected files.
Does Venture Electronics provide a standard schedule for every project?
Schedule is reviewed by project because BOM availability, complexity, quantity, and testing scope vary.
Should I name the supply model in the RFQ?
Yes. State whether the project is consigned, kitted, partial-turnkey, full-turnkey or mixed supply. Material responsibility affects sourcing review, shortage handling, approved alternatives and schedule discussion.
Catalog downloads
Download the English Venture Electronics catalogs below. Confirm project-specific specifications and quotation scope by email before relying on catalog details.
